總網頁瀏覽量

2017年6月12日 星期一

Technical Visit to Siu Ho Wan Sewage Treatment Works in Hong Kong on 8 July 2017

Technical Visit to Siu Ho Wan Sewage Treatment Works in Hong Kong on 8 July 2017

Date
:
8 July 2017, Saturday
Venue
:
DSD Siu Ho Wan Water Treatment Works, 440 Cheung Tung Road, Lantau Island, Hong Kong.
Time
:
09:30. to 12:00
Assembly Time and Point
:
08:15 (Kent Road, near EXIT “F” of Kowloon Tong MTR Station)


SPEAKER           : Representative from the Drainage Services Department

VISIT HIGHTLIGHTS
Climate change and Electricity Saving are hot topics. The community must jointly practice the principles of "use less, waste less", including energy and water conservation, and green energy sources, with an aim of moving towards a low-carbon society.
In addition to the promotion of energy saving to tie in with the carbon reduction targets, the Government is actively exploring opportunities for harnessing renewable energy sources, for places such as sewerage treatment plants.
Hong Kong's Largest Solar Farm has been built in the Siu Ho Wan Sewage Treatment works, and was launched in December of 2016. The plant is equipped with over 4200 panels and generates 1.1 million kW hrs of electricity annually for the Siu Ho Wan Sewage Treatment works, which is about 25% of the current annual electricity consumption of the plant.
The visit will explore both the Treatment Process and the Solar Farm. Applications for the visit will commence from 9 June 2017.

CPD Certification
3- hour CPD certificate will be jointly issued by BSOMES and EIHK for qualified attendants.

Registration & Enquiries
This technical visit is free of charge with a maximum capacity of 30 and is based on first-come-first served. For registration, please enroll at:

The deadline for application is 23 June 2017 (Friday) or when the registration is full. Successful applicants will be informed by receiving a confirmation e-mail on or before 3 July 2017 (Monday). If the applicants have not received the confirmation e-mail on or before 3 July 2017, their applications will be regarded as not successful.

Fee
Free of Charge and with free shuttle bus service between Kowloon Tong and DSD Siu Ho Wan Sewage Treatment Works.

Insurance
Limited accident insurance will be provided for Members at the venue whilst passenger insurance will be separately provided by the shuttle service provider for all passengers. If deemed necessary, participants are encouraged to arrange their own insurance for accident coverage for the whole technical visit.

If typhoon signal no. 8 or black rainstorm signal is in force and still hoisted after 06:00 am of 8 July 2017, the visit would be cancelled without further arrangement or notification.

YSWong
2017年6月11日

沒有留言: